We do not sell promises: we deliver projects with measurable savings.
Turnkey efficiency programs for steam and condensate networks in refining and petrochemicals, focused on sustained technical and economic results.
Target indicators
Reduce losses and stabilize the network with a technical approach
Compact program aimed at measurable savings, operational reliability, and criticality-based maintenance.
Project phases with impact traceability
Assessment
We determine baseline and savings potential with maximum technical rigor.
Feasibility
We analyze steam trap options, technology, and cost-benefit to define the optimal solution.
Execution
Engineering, installation, testing, commissioning, and knowledge transfer to the plant team.
Intensive maintenance
Continuous follow-up and immediate preventive/corrective action to sustain savings over time.
Representative cases in real industry
Selection of projects with scope, technology used, and operational focus for quick reading by need type.
ILBOC
CartagenaLarge-scale ISA100 project to digitalize the steam and condensate network.
- Scope: 904 monitored elements
- Approach: continuous monitoring and intensive maintenance
- Impact: technical prioritization of actions by criticality
Repsol
PuertollanoDeployment of SmartWatchWeb across multiple process units with operational integration.
- Scope: phased rollout in critical units
- Approach: service continuity and traceability
- Impact: greater control of real asset status
Petronor
MuskizProgram focused on reducing inspection costs and improving maintenance reliability.
- Scope: monitoring of relevant network assets
- Approach: data-driven preventive and corrective maintenance
- Impact: lower rate of unplanned incidents
Moeve
HuelvaAdvanced steam trap failure control with sustained efficiency results.
- Scope: turnkey project in energy park
- Approach: IIoT monitoring + immediate field action
- Impact: improved reliability and steam savings
Solvay
Programa internacionalGlobal monitoring program to drive energy efficiency and CO2 reduction.
- Scope: standardization of criteria across plants
- Approach: technical reporting and ESG KPI tracking
- Impact: global visibility and continuous improvement
Saudi Aramco / KNPC
Proyecto internacionalSupply and installation of smart steam solutions in highly demanding projects.
- Scope: Ras Tanura, Jazan, Marjan, and Riyas refineries + KNPC
- Approach: multi-contractor deployments and high traceability
- Impact: international scalability of the solution
Repsol
Cartagena and CorunaProject extensions focused on sustained savings and network operational stability.
- Scope: continuity and expansion of deployments
- Approach: methodology harmonization across plants
- Impact: cross-site maintenance improvement
Why ultrasounds alone are not enough
Ultrasound detection can lead to incorrect interpretations in steam traps due to flash steam during condensate discharge.
In high-impact projects we combine continuous monitoring and maintenance methodology to separate false alarms from real leaks and prioritize interventions correctly.
Top-tier industrial references















